Product / Title
22 Meters Gantry Steelworks with 8 Support Columns for Crane Tracks

Client Name
Galvanized UK

Date
22-11-2024

Client Location

Duration
2 Week installation

Workers
Engineers Kevin Duane Richard

Steel work
Consisted of 8 of support columns also 6 of lengths of crane track giving a total run of 22 meters gantry steelworks. The tracks and columns were finished in twin pack Ral 4006 coat paint and installed onto their prepared foundations.

Conductor System
The bus bar system that feeds the crane was 22 meters long copper and came complete with mounting brackets and one set of current carrying collectors. The system is a new four bar finger proof one.

Job Description
Special Twin hook twin hoist Clayton crab unit

Safe working load
4,000 kg (2 X 2,000 Kg hooks)

Span

11.7 meters

Manufacturer

Clayton

Crane Type
Double beam

Height of lift

7 metres

Hoist type
Twin Wire rope Crab unit (Special 4 meter guage)

Hoist speed

Tripple Speed

Cross travel

Dual

Long travel

Dual

Control

Pendant

Radio control

Yes

Environment

Indoor Galvanizing Environment

Finish

Twin pack Ral 4006

Dispatch/Delivery/
Warranty Method: This crane was reconditioned and serviced prior to despatch. Was delivered on time with a  2-year warranty

Customer Feedback
Delighted with end result