Product / Title
22 Meters Gantry Steelworks with 8 Support Columns for Crane Tracks
Client Name
Galvanized UK
Date
22-11-2024
Client Location
Duration
2 Week installation
Workers
Engineers Kevin Duane Richard
Steel work
Consisted of 8 of support columns also 6 of lengths of crane track giving a total run of 22 meters gantry steelworks. The tracks and columns were finished in twin pack Ral 4006 coat paint and installed onto their prepared foundations.
Conductor System
The bus bar system that feeds the crane was 22 meters long copper and came complete with mounting brackets and one set of current carrying collectors. The system is a new four bar finger proof one.
Job Description
Special Twin hook twin hoist Clayton crab unit
Safe working load
4,000 kg (2 X 2,000 Kg hooks)
Span
11.7 meters
Manufacturer
Clayton
Crane Type
Double beam
Height of lift
7 metres
Hoist type
Twin Wire rope Crab unit (Special 4 meter guage)
Hoist speed
Tripple Speed
Cross travel
Dual
Long travel
Dual
Control
Pendant
Radio control
Yes
Environment
Indoor Galvanizing Environment
Finish
Twin pack Ral 4006
Dispatch/Delivery/
Warranty Method: This crane was reconditioned and serviced prior to despatch. Was delivered on time with a 2-year warranty
Customer Feedback
Delighted with end result